Use case · Quality and SOP change

A controlled SOP change rarely stops at the SOP

For quality teams in medical-device manufacturing, one revised obligation or deadline can create a review problem across work instructions, checklists, training, and related procedures.

Prototype

Inspectable claims. Declared scope. Human accountability.

The familiar workflow

A Quality Systems specialist receives a revised SOP, reviews redlines, searches for references, asks subject-matter experts what depends on the change, records an impact assessment, and follows actions through the existing quality process.

  • The difficult part is not seeing that text changed.
  • The difficult part is establishing which meaning changed, where it propagates, what remains uncertain, and why each decision is defensible.

Synthetic case: 30 days becomes 15, and may becomes must

QMS-SOP-014 v4.1 says the Quality Investigator may initiate an investigation within 30 calendar days. Version 4.2 says the investigator must initiate it within 15 calendar days.

  • Semantic Delta: OPTIONAL → MANDATORY
  • Timing: WITHIN 30 CALENDAR DAYS → WITHIN 15 CALENDAR DAYS
  • Potentially affected: WI-08 and CL-04
  • Review required: TR-22 inferred training relationship
  • Bounded unaffected: FRM-11
  • Not evaluated: stale SOP-21
Synthetic case

Text, meaning, and impact are different records

Move through three levels. Each level keeps its own evidence basis and does not silently become the next.

  1. Changed text exact evidence
  2. Semantic Delta reviewed interpretation
  3. Downstream impact dependency-based inference

Level 1 · exact evidence

Text diff

Version 4.1

The Quality Investigator may initiate the investigation within 30 calendar days of intake.

Version 4.2

The Quality Investigator must initiate the investigation within 15 calendar days of intake.

This establishes: which exact source characters differ. It does not establish normalized meaning or downstream impact.

Level 2 · reviewed interpretation

Semantic Delta · SD-SYN-001

Actor
Quality Investigator
Action
initiate investigation
Modality
OPTIONAL → MANDATORY
Timing
WITHIN 30 CALENDAR DAYS → WITHIN 15 CALENDAR DAYS

This establishes: the normalized meaning accepted for this synthetic narrative. It does not establish which downstream objects depend on that meaning.

Level 3 · dependency-based inference

Downstream impact

ObjectRelationship stateBounded outcome
WI-08confirmedpotentially affected
CL-04confirmedpotentially affected
TR-22inferred — review requiredreview required
FRM-11evaluatedno relevant impact found within evaluated scope
SOP-21blockednot evaluated

This establishes: outcomes supported by eligible paths inside the declared evaluation. Text comparison alone did not produce these findings.

Declared boundary: A result applies only to this declared synthetic portfolio, frozen graph, applicability policy, and evaluation budget.

Synthetic case

Inspect the path, not just the outcome

Select a target to inspect its node, relationship basis, evidence, lifecycle state, version, and bounded impact reason.

Changed claimSD-SYN-001QMS-SOP-014 · §6.2

Target node · WI-08

Investigation Work Instruction

potentially affected
  1. Source evidenceQMS-SOP-014 v4.2
  2. Semantic DeltaSD-SYN-001
  3. Relationshipreferences and restates
  4. TargetWI-08
Object
WI-08 · Investigation Work Instruction
Type
Controlled work instruction
State
confirmed
Reason
The work instruction repeats both changed fields.
Source
QMS-SOP-014, Section 6.2, paragraph 2
Evidence
Section 2 cites QMS-SOP-014; section 4.1 repeats the 30-day initiation window.
Relationship
references and restates
Origin
exact reference plus structural match
Method
deterministic reference rule v1
Lifecycle state
confirmed
Graph version
GRAPH-SYN-2026-09-15-01
Comparison
CMP-SYN-2026-09-15-01

Target node · CL-04

Investigation Intake Checklist

potentially affected
  1. Source evidenceQMS-SOP-014 v4.2
  2. Semantic DeltaSD-SYN-001
  3. Relationshipimplements
  4. TargetCL-04
Object
CL-04 · Investigation Intake Checklist
Type
Controlled checklist
State
confirmed
Reason
The acceptance criterion contains the previous deadline.
Source
QMS-SOP-014, Section 6.2, paragraph 2
Evidence
Checklist item 7 asks whether initiation occurred within 30 calendar days.
Relationship
implements
Origin
field-to-claim match
Method
policy rule v3
Lifecycle state
confirmed
Graph version
GRAPH-SYN-2026-09-15-01
Comparison
CMP-SYN-2026-09-15-01

Target node · TR-22

Investigator Refresher Training

review required
  1. Source evidenceQMS-SOP-014 v4.2
  2. Semantic DeltaSD-SYN-001
  3. Relationshiptrains
  4. TargetTR-22
Object
TR-22 · Investigator Refresher Training
Type
Training module
State
inferred — review required
Reason
The content is semantically related, but the relationship is not yet confirmed.
Source
QMS-SOP-014, Section 6.2, paragraph 2
Evidence
Module 3 teaches investigation initiation timing but does not cite the SOP identifier.
Relationship
trains
Origin
semantic candidate
Method
bounded candidate classifier v2
Lifecycle state
inferred — review required
Graph version
GRAPH-SYN-2026-09-15-01
Comparison
CMP-SYN-2026-09-15-01

Declared boundary: A result applies only to this declared synthetic portfolio, frozen graph, applicability policy, and evaluation budget.

What the prototype can support

Inside a declared synthetic portfolio, the current basis supports exact old/new semantic change evidence, versioned dependency candidates, bounded impact paths, explicit uncertainty, and accountable review states.

  • It does not claim a complete organizational dependency graph.
  • It does not claim production-scale recall or a customer outcome.
  • It does not close the controlled change in the current M0–M4 baseline.

A historical replay starts from existing records

A first evaluation can begin from one completed change case, its known downstream review set, and the decisions already recorded in the governed quality process. The synthetic scenario does not represent a specific integration or transfer system-of-record responsibility.

Systems of record

QMS · DMS · GRC · ALM · requirements · workflow

Controlled content and approvals remain here.

EvidView

Scoped versions → governed findings

No implemented connector is implied.

Next step

Bring one bounded change into view.

Privacy choices

Optional measurement

Essential delivery and security remain active. Optional measurement is separate and stays off unless you allow it.

Allowlisted interaction measurement

Only the event name, page template, coarse viewport, locale, consent-notice version, and synthetic/test markers may be sent.

Off

Read the Privacy Notice. The preference expires after six months and can be changed here at any time.